About hongxing
Contact us
- Tel: +0086-371-67833161
- E-mail: [email protected]
- MSN: [email protected]
News Center
Home>News CenterSome Basic Principles of Ore Beneficiation Site Selection
2. The landform of ore beneficiation site should be suitable for ore beneficiation process as much as possible. Apart from size, the best situation is that the ore pulp can achieve automatic flow, then half-automatic flow, then pressurization. The suitable slope of crushing plant is 25° or so and the slope of main factory is 15° or so. If there is no suitable landform, we should consider its water discharging. The ore beneficiation plant with half-automatic flowing should be between the above two situations in slope.
3. We should conform to the land saving principle. No matter to build factory on slopes or on the ground, we should save land as much as possible, especially the fertile field. As for the tailings store, we should reclamation it under permitting conditions.
4. The tailings store should adopt the low valleys or depressions, making the least construction work of engineering project at the same time of achieve biggest volume capacity. The tailings site should be close to ore beneficiation site to save transportation fees. We also should avoid tailings pollution to environment, river, agriculture and living area.